Special types of SRU¶
SRU series
The article series covers all aspects of Stable Release Updates (SRUs).
Understand the SRU process:
Stable Release Updates (SRU) - What SRUs are and how an update travels through the SRU pipeline
Principles - The principles behind the strict rules implying What is acceptable to SRU
About the SRU role - Who does what in the process, and the internal team docs
Perform an SRU:
Perform a standard SRU - How to fix a straightforward bug, step by step, and the common issues to avoid
Status pages - Track your SRU’s progress from sponsorship to release
SRU verification - Test the update in -proposed and report the results
Report a regression - Timely reports help to minimize impact
References in regard to the SRU process:
Prepare a special type of SRU - Special types such as staged uploads, NEW queue entries or package removals
Troubleshooting - How to Handle an autopkgtest failure or halted phased updates
SRU bug template - Used to Document how an SRU bug fulfills the criteria in a structured way
Package-specific notes - Standing exceptions for individual packages
What is acceptable to SRU, together with other considerations, give rise to the following special types of permitted SRU, some of which overlap:
Package-specific non-standard process: for routine non-standard cases, we create package-specific notes for consistency. These may incorporate any of the other special types below and may include any exceptions to our usual criteria that have been approved by the Technical Board.
Hardware enablement: for Long Term Support releases we regularly want to enable new hardware [criteria].
Environmental change: updates that need to be applied to Ubuntu packages to adjust to changes in the environment, server protocols, web services, and similar [criteria].
Autopkgtest fix: autopkgtest fixes may be included in SRUs. An update that fixes only autopkgtests is also acceptable, but should normally be staged [criteria].
Extended Security Maintenance: there are special procedures for uploads to stable releases in their Extended Security Maintenance (ESM) period. Please prepare the SRU bug and subscribe the ~ubuntu-esm team to it.
Staged upload [explanation], [how-to: stage upload], [how-to: land staged upload].
Upload to the new queue of an active release [explanation], [how-to: new source or binary].
Bundled upload: an SRU performed “on top” of an existing package already in -proposed. [TBC]
New upstream release:
New bugfix-only upstream release
Bugfix-only releases are acceptable if all changes are appropriate for an SRU under our normal criteria, by one of two paths:
The upload may use the new upstream orig tarball, but with individual Launchpad bugs to track verification of each fix individually.
Instead, if upstreams meet, in the opinion of the SRU team, our more specific QA criteria for upstream microreleases then it is acceptable to process them with a single tracking bug instead of individual Launchpad bugs for each fix. If relying on this path, the upstream QA process that meets this criteria must be documented/demonstrated and linked from the SRU tracking bug.
New upstream release that adds features without breaking existing behaviour
For Long Term Support releases we sometimes consider it appropriate to introduce new features. We may choose to do so we can do this safely. However, to meet expectations of release stability, we will consider these on a case-by-case basis [criteria].
New upstream release that changes existing behaviour
Deliberately changing existing behaviour is to be avoided due to our minimise regression principle, so such SRUs are generally not permitted. Exceptions may be granted by the Technical Board, but require exceptional justification. Standing exceptions are documented in Package-specific notes.
Removals: in rare cases, a package is or has become actively harmful to users, and is replaced by an empty package [explanation].
Security updates: these usually follow a different process and are out of scope of the SRU team and processes documented here. See Security team’s Update Procedures for details [explanation].